Academic WritingEngineering Fundamentals problem related to concret

已完成 已发布的 Apr 17, 2014 货到付款
已完成

Problem: You have been charged with deciding which approach to take at fixing or replacing the electrical supply lines to a little town in the hills. You can overhaul existing system, install an underground system along an existing road or install an overhead system through the hills. Evaluate the costs and implications to each of the options and recommend the best approach to take. Do not worry about the time value of money for this problem. This would, of course, be of significance in the real world. You will do those calculations in engineering economics

学术写作

项目ID: #5817969

关于项目

2个方案 远程项目 活跃的Apr 18, 2014

授予:

hassan914

hi here is the professional in this work just send me offer i will deliver you high quality work at the fixed time

$5 USD / 小时
(3条评论)
1.2

有2名威客正在参与此工作的竞标,均价$6/小时

sachinmurkute88

___Career objective To make a sound position in corporate world and work enthusiastically in team to achieve goal of the organization with devotion and hard work. Educational Qualification • MBA(production and mater 更多

$6 USD / 小时
(0条评论)
0.0