• Microsoft XP applications (Word, Excel, Office, PowerPoint, Outlook, Access) – Advanced
• Microsoft Office Document Imaging and Scanning - Advanced
• Acrobat Reader 6.0 – Intermediate
Estimating quantities and cost of material, labour / equipment based on contract drawings, specification.
Quantity takes off, break down as per the tender documents & pricing.
Coordinate with Consultants, Contractors, Statutory agencies and customer with consummate ease.
Preparing Tender documents and prepare the BOQ with the help of design , purchase department & Manger.
Prepare quantity take off from the drawings and tender documents as per scope
Prepare variation order of all works which is not clear in scope of work given on tender documents.
Co-ordinates with sub contractor and consultant for the quantity verification and preparing of the BOQ.
Preparation of payment certificate.
Deal with subcontractor and certify their bills.
Compression between the budget cash flow and actual certificate.
Prepare inquiries to receive quotations for material, service and subcontract work.
Filing the quotations and tender documents as per the requirements and serve as a reference projects.
Prepare the price list comparison of all supply and subcontractor’s items.
Attend kick of meeting to clarify all doubts, as and when required.
Responsible for attend Consultant inspections.
Key activities also entire management of materials, overall monitoring of all sites and coo