Design of penstock pipe for a hydroelectric pumped storage station

已取消 已发布的 Nov 16, 2011 货到付款
已取消 货到付款

The task posed in this case study is to choose between two candidate steels for the construction of pressure pipes within a hydroelectric pumped storage power station. Having selected the steel, you are required to specify the wall thickness of the pipe given the internal pipe diameter, load history, design life and non-destructive inspection limitations. Each student will have a slightly different set of parameters to work with. Your report should include the design decision that you have made complete with full justification of that decision and recommendations on inspection intervals.

## Deliverables

Detectable falw size= 3mm Pipe diameter= [url removed, login to view] Static head of water= 550m Max head of water during hammer= 750m

工程

项目ID: #3700462

关于项目

远程项目 活跃的Dec 9, 2011