Assisgment on Under-frequency Load Shedding (UFLS) Scheme
$350-400 HKD
已取消
已发布超过 8 年前
$350-400 HKD
货到付款
To design the load shedding block size for each stage of the UFLS scheme to minimize the total load shedding amount while ensure the frequency recovery to the acceptable frequency range under all tested system contingencies.
Detail in Mini-Project Brief attachments.
A report within 5-10 pages about 3 days.