Find Jobs
Hire Freelancers

Australian BUILDING AND CONSTRUCTION BCA volume 1/NCC

$30-250 AUD

已关闭
已发布超过 7 年前

$30-250 AUD

货到付款
Part A – Deemed to Satisfy Solution You will be given two (2) Performance Requirements from BCA Volume 1(2016). Which are FP1.3 And EP2.1 Visit two buildings in the Class 3 to 9 range of classifications. These can be multi classification buildings but must be different buildings. RMIT building 56/57 is not to be used since it is Type A construction. Select any component or installation in each building which is a Deemed-to-Satisfy (DTS) solution. This solution; as you should know is in the building to comply with a Performance Requirement. Take one photograph of the front of each building and classify the part where your DTS solutions are located. Also photograph each of your DTS solutions. In the written part of the assignment you will quote from the BCA only the DTS that required your solution to be in the building. Remember the DTS includes specifications which become part of the DTS. You are advised to think about which DTS you understand before you decide on a DTS solution. Also include a cut and paste of one relevant clause from any one Australian Standard referenced in the Deemed to Satisfy Provisions (or Specification, if any) you are quoting from. Each Deemed to Satisfy Solution is to be written about separately. The DTS for each solution is to be written as steps that lead to a DTS solution. Marks will be deducted for the inclusion in your assignment of any incorrect BCA clauses that could not possibly be related to your chosen features. Part B – Performance Solution (a) From Part A of this assignment select one of your DTS solutions and assume it is possible to develop a Performance Solution for it. Therefore what you photographed will no longer be in the form it is or may not be there at all. (i) Describe how you will use one of the A2.2 Evidence of Suitability methods allowed by A0.5 (a) and one of the A0.5 other Assessment Methods (c), or (d) to attempt to prove that your Performance Solution complies with a Performance Requirement. Note: for simplicity, your proposed Performance Solution will not affect other Performance Requirements and relevant DTS as is often the case. Read BCA A0.7 (a) & (b) for further understanding of this. (ii) Assume A0.7 now applies to your Proposed Performance solution. Describe the implications of this and attempt to give an example relevant to your Performance Solution. (b) Verification Methods and ABCB Protocols. (i) What is a Verification Method? (ii) Select one Verification method from the following - BV1, CV1, DV1, EV4.1 or FV5.1 – describe how it can be used to comply with a Performance Requirement. (iii) What is an ABCB Protocol? How can one be used in Section B of the BCA?
项目 ID: 11515751

关于此项目

活跃7 年前
位置: Bundoora, Australia

想赚点钱吗?

在Freelancer上竞价的好处

设定您的预算和时间范围
为您的工作获得报酬
简要概述您的提案
免费注册和竞标工作

关于客户

AUSTRALIA的国旗
Australia
0.0
0
会员自9月 13, 2016起

客户认证

谢谢!我们已通过电子邮件向您发送了索取免费积分的链接。
发送电子邮件时出现问题。请再试一次。
已注册用户 发布工作总数
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
加载预览
授予地理位置权限。
您的登录会话已过期而且您已经登出,请再次登录。