未找到工作

抱歉,我们无法找到您正在寻找的工作。

在这里找到最新的工作:

We have lots of long passages. You have to narrow them down into bulleted points.

$10 - $30
$10 - $30
0 个竞标
Christ banner 2018 6 天 left
已验证

banner project for Kris, design Christmas banner for company

$34 (Avg Bid)
$34 平均报价
39 个竞标

Logo/Label design for a new FMCG product

$48 (Avg Bid)
$48 平均报价
14 个竞标

I need a logo designed. Just a simple logo representing my club

$26 (Avg Bid)
$26 平均报价
42 个竞标

I need to implement vf control of 3 Phase induction motor please provide bid in details rest details will be provide in chat box. I have a fix budget.

$23 - $190
$23 - $190
0 个竞标

This is a company based project and will be looking for only translators/companies from Singapore. We require efficient translators. Do PM if keen, details will be given.

$182 (Avg Bid)
$182 平均报价
5 个竞标
build website 6 天 left

I need a new website with content for my small business

$432 (Avg Bid)
$432 平均报价
58 个竞标

Hi, We need some one who can do a custom floodlight code for a website. In short, we have a live chat widget that feeds data into Analytics using event labels. We need a floodlight to fire only when this data is met. For example, the live chat plugin uses the event category "Lead". So when this data is seen, we need a seperate floodlight to fire to GMP. This will need someone exper...

$109 (Avg Bid)
$109 平均报价
6 个竞标
Build an App-2 6 天 left

1. Android and IOS app required for patient and consultant 2. Web application required for consultant and patient [登录来查看链接] should have facility to upload the docs 4. Video consultation clip saved on server 5. Doctor can upload prescriptions 6. Appointment system required with payment gateway 7. HIS integration 8. Payment gateway account and finance data reconciliation 9. marketing Advertising pus...

$1345 (Avg Bid)
$1345 平均报价
9 个竞标

Consider the classical power system where one generator is connected to the infinite bus through two transmission lines. We want to study the transient stability for a fault on one of the two lines. The generator parameters are as follows: Pm = 1, H = 4, KD = 5, x'd = 0.25, E' = 1.4. The transmission line where the fault occurs has a line reactance of 0.6 pu. The other transmission li...

$58 (Avg Bid)
$58 平均报价
4 个竞标