Civil Engineering Fundamentals problem related to concret -- 4
$2-8 USD / hour
已关闭
已发布大约 10 年前
$2-8 USD / hour
Problem: You have been charged with deciding which approach to take at fixing or replacing the electrical supply lines to a little town in the hills. You can overhaul existing system, install an underground system along an existing road or install an overhead system through the hills. Evaluate the costs and implications to each of the options and recommend the best approach to take. Do not worry about the time value of money for this problem. This would, of course, be of significance in the real world. You will do those calculations in engineering economics