Hi,
I am feeling very glad to bid on this project as it exactly matches with my area of expertise.
I am currently working in a multinational EPC company's design office as an electrical design engineer with 3 years experience and recently completed relay settings and coordination study on 450 MW power generation plant's substation based on ETAP 12.5 as well as prepared all relevant interconnection diagrams, BOM, schematic diagrams, layouts etc for the substation.
Moreover, I have following areas of expertise:-
1. Network studies based on ETAP and report preparation for (Load flow, Short circuit, Motor starting, Harmonic analysis, Transient stability and relay coordination)
2. Sizing and selection of major electrical equipments (Switchgear, Transformer, UPS, Solar panel, Battery bank, Capacitor bank, Cable, Motor, Generator)
3. Preparation of SLD, Interconnection diagrams, Protection schemes, intertrip logic schemes, load list etc
4. Cabling works (Power layouts, cable trench/tray sizing and layouts, cable schedule etc)
5. Lighting design (Lux level calculation, Lighting layouts, panel circuit schedule etc)
6. Earthing and lightning protection (Earthing calculations, earthing layouts, typical installation details etc)
7. RFQ, BOQ, MTO preparation and TBE.
I also have CAD expert with me for preparation of all AutoCAD based drawings.
I fully understands your project needs and curiously waiting for your response.
Please provide me further details.
Regards
Talha