Find Jobs
Hire Freelancers

Construction Management

£10-20 GBP

已关闭
已发布大约 10 年前

£10-20 GBP

货到付款
Hi there, I have an exam coming up for the construction management module where I have to describe the ethics of the company and sustainable solutions. There are two questions as it is a seen examination and I need a starting point. So I will add both the questions and please, please only bid if you have previous knowledge of this kind of work and you believe you can do it properly and have a spot of time to do it and not just rush through it. The questions are: Q1. As part of the MGMT module students were engaged in a simulation activity, which involved playing the role of engineers working for a company that expressed an interest in tendering for work with the Environment Agency. As part of the expression of interest, each team had to prepare an overview of their company that included a statement of the company ethics and its commitment to sustainability and environmental issues. i.) Describe, with links to relevant literature, the ethical and sustainability principles that you and your team reviewed as a precursor to the development of your company overview. You should describe all the ethical principles, but need only describe in detail the guidance taken from one sub-section from the introduction to the sustainable development document that the team was tasked to review. You should also explain how these principles were interpreted, based on the simulation scenario, in order to be incorporated into your company overview. (30 marks) ii.) With the benefit of hindsight, and by drawing on examples from the simulation activity conducted as part of the module, describe and assess two situations that effectively demonstrate the challenges of applying the ethical and sustainability principles in practice. (20 marks) Q2. As part of the MGMT module, you were given a tender assignment. For the assignment you worked in a team to develop and submit a tender for a construction project. Specifically, the team were required to quantify labour, plant, material and sub-contract requirements for the works and then worked collectively to cost and sequence the activities in order to develop a tender price, a works programme and an expenditure forecast for the whole project. i.) In relation to the planning of construction activities, and with links to relevant literature, describe three systems appropriate for managing time, cost and risk respectively in the environment of construction practice. (20 marks) ii.) By imagining that you are employed in the role of a project manager tasked with managing a team of engineers engaged in a tender activity, explain how you would apply the three systems described in part i. to effectively manage the team. Augment your explanation with three examples (one example specific to each management system) drawn from the module tender assignment. (30 marks)
项目 ID: 5769121

关于此项目

1条提案
远程项目
活跃10 年前

想赚点钱吗?

在Freelancer上竞价的好处

设定您的预算和时间范围
为您的工作获得报酬
简要概述您的提案
免费注册和竞标工作
1威客以均价£70 GBP来参与此工作竞标
用户头像
Dear Sir, I'm civil engineer with 6 years experience and I can finish this job but your budget in not enough for this. My last price is 70. Deadline 7 days. Sincerely, Vahidin Alibegovic, B.Eng.Civ.
£70 GBP 在7天之内
5.0 (6条评论)
3.5
3.5

关于客户

UNITED KINGDOM的国旗
Plymouth, United Kingdom
5.0
1
付款方式已验证
会员自2月 11, 2014起

客户认证

谢谢!我们已通过电子邮件向您发送了索取免费积分的链接。
发送电子邮件时出现问题。请再试一次。
已注册用户 发布工作总数
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
加载预览
授予地理位置权限。
您的登录会话已过期而且您已经登出,请再次登录。