Find Jobs
Hire Freelancers

ASP Gantt Chart for Project Management System

$100-125 USD

已完成
已发布大约 19 年前

$100-125 USD

货到付款
Need a dynamically created Gantt chart to integrate into existing ASP-based project management software (demo available at [[login to view URL]][1]). Must graphically represent relationships between tasks in the project flow, and differentiate critical-path from non-critical-path tasks. Must also graphically represent percentage of work done for each task. Tasks shown in the chart must link to details for the task (task details are an existing part of the system; only the link needs to be set up). Chart may be either html or flash format, so long as it integrates with the existing system. Access database is designed to contain all necessary information for population of the chart, including: task start date, task end date, duration, relationship to other tasks, critical path indication, etc. All necessary information is contained in one table except the completion percentage for each task, which is a simple calculation based on information in a related table. ******Update******** To log in to the demo site mentioned above, use "demo" as the username & password. ## Deliverables Rent A Coder requirements notice: As originally posted, this bid request does not have complete details. Should a dispute arise and this project go into arbitration "as is", the contract's vagueness might cause it to be interpreted against you, even though you were acting in good-faith. So for your protection, if you are interested in this project, please work-out and document the requirements onsite. 1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done. 2) Deliverables must be in ready-to-run condition, as follows (depending on the nature of the deliverables): a) For web sites or other server-side deliverables intended to only ever exist in one place in the Buyer's environment--Deliverables must be installed by the Seller in ready-to-run condition in the Buyer's environment. b) For all others including desktop software or software the buyer intends to distribute: A software installation package that will install the software in ready-to-run condition on the platform(s) specified in this bid request. 3) All deliverables will be considered "work made for hire" under U.S. Copyright law. Buyer will receive exclusive and complete copyrights to all work purchased. (No GPL, GNU, 3rd party components, etc. unless all copyright ramifications are explained AND AGREED TO by the buyer on the site per the coder's Seller Legal Agreement). 4) Well-commented code for future reference ## Platform ASP
项目 ID: 3562579

关于此项目

3提案
远程项目
活跃19 年前

想赚点钱吗?

在Freelancer上竞价的好处

设定您的预算和时间范围
为您的工作获得报酬
简要概述您的提案
免费注册和竞标工作
颁发给:
用户头像
See private message.
$85 USD 在10天之内
5.0 (16条评论)
4.3
4.3
3威客以平均价$88 USD来参与此工作竞价
用户头像
See private message.
$89.25 USD 在10天之内
5.0 (12条评论)
3.7
3.7
用户头像
See private message.
$90.10 USD 在10天之内
0.0 (0条评论)
0.0
0.0

关于客户

UNITED STATES的国旗
Louisville, United States
5.0
25
付款方式已验证
会员自2月 10, 2005起

客户认证

谢谢!我们已通过电子邮件向您发送了索取免费积分的链接。
发送电子邮件时出现问题。请再试一次。
已注册用户 发布工作总数
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
加载预览
授予地理位置权限。
您的登录会话已过期而且您已经登出,请再次登录。